Main menu

A Gift List for the kind sponsors of the Oddiyana Dharma Sanctuary
Thank to all our kind sponsors who have shown interest in supporting a wonderful community project. We have made out a list for the sponsors who have so kindly offered their support to the Oddiyana Dharma Sanctuary. These items are for short and long term plans so we have been optimistic in our prayers for it is a Buddhist concept that "What you think is". Some of the Buddhist items you see you may not understand why they cost so much but from a Buddhist perspective things such as Prayer Wheels, Stupas and large Buddha statues inspire compassion, generosity and loving kindness in the hearts of Buddhists and non-
We are in the process of creating a Board of Generosity where we will highlight the generosity of our sponsors.
We are in need of a cash donation and/or necessary items for the kitchen and bedrooms such as bunk beds and corresponding bedding in time for our first Pre Christmas Meditation Retreat on the 9 th December 2011.
We thank you for having the desire to help your community so in appreciation of your kindness will work hard to benefit as many beings as possible in honour of your selfless act. Thank you
Kitchenette (ex room 1) plus Main Kitchen
Cabinet maker and builders labour and materials to connect dining room and first room and remove bathroom and reinstall in room and replace with kitchenette estimated costs.
New Coffee plungers
10 X large
10 X small
Coffee machine
10 One cup tea pots
10 Two cup tea pots
Commercial blender
Commercial knives
Commercial mixer (Mixmaster)
1 X New cupboard for large sink
1 X Mixer taps for large sink
Paint and painting of ceiling and walls
Edging for linoleum = ......meters
2 X large Commercial Urns
Cafe
Labour and material costs to put steps and balcony up to cafe from esplanade.
Estimated costs=
Labour and material costs to renovate and combine old room one and the cafe
2 X Fans
20 X Tables and chairs
2 X Club Chairs, 1 small couch and coffee table set
Material and labour for Floor sanding and painting
Materials and labour for Renovation of kitchenette for cafe
I X Display fridge and cake display for kitchenette
Material and labour for combining 2 rooms and removing bathroom
Office
Materials and labour costs to rebuild office front.
Shredder
Archive boxes
Sponsor for ink cartridges...estimated costs=
1 X Computer for events Manager
1 X Microsoft program
Website sponsor to pay ongoing fees. Estimated costs=
2 X New printers with refillable ink cartridges
Blinds X 16 various sizes. Estimated costs=
Library
Labour for removing shower and installing in another room. Estimated costs=
Shrine Room
Material & Labour for Customised Divider between office and shrine to have less noise (timber, heavy curtain or air is best).
Estimated costs=
Labour & materials for large frames of painting canvas along shrine room between poles plus the labour. Estimated costs=
Labour and material costs for Sky lights. Estimated costs =
Labour and material Lighting. Estimated costs =
50 large cushions with black covers made to fit + 50 small white
Estimated costs=
Labour and material for Mirror Wall and reflection mirror behind Buddha. Estimated costs =
Sangha Dining Room
1 X Very large circular table & Chairs to accommodate 20+ people. Estimated cost=
Sangha Lounge Room
1 X Large half circle couch to accommodate 20+ people
Estimated cost=
Bedrooms
Room 1
2 X Bunk Beds and Mattresses
2 X Privacy curtains between bedroom and showers
1 X Large Blind
Plumbing labour. Estimated cost=
Room 2
2 X privacy Curtains
Labour for installing shower cubicle and accessories from old room to new room
I X Mirror
2 X Bunk Beds
Room 3
Material and Labour costs for Floor Sanding and applying estapol. Estimated cost=
2 X Bunk Beds
2 X privacy Curtains
New Vanity. Estimated cost=
Basin and taps. Estimated cost=
New lights. Estimated cost=
New blind handle
Material and labour costs for painting room Estimated cost=
Room 4
Material and labour costs of installing shower from library room 14.
Estimated costs =
1 X privacy curtain
1 X Wardrobe
2 X Double bunks
Room 5
1X New Shower base and accessories. Estimated cost=
1X New vanity and bowl. Estimated cost=.
1 X Privacy Curtain Bedroom
Material and labour costs for sanding and estapoling floor.
2 X single bunk beds
Room 6
2 X privacy Curtains
1 X New Vanity cupboard with bowl Estimated cost=
2 X Bed Bunks
New Vanity cupboard and bowl. Estimated cost=
New Shower Base and Glass. Estimated cost=
Room 7
1 X new shower cubicle. Estimated cost=
1 X Bunk Beds
1 X new vanity cabinet, bowl and taps. Estimated cost=
2 X privacy curtains
Room 8 -
1 X new Shower cubicle /taps and shower. Estimated cost=
New vanity/ bowl and taps. Estimated cost=
Material and labour costs for sanding floor and estapoling.
Estimated costs=
Material and labour costs for painting rooms.
Estimated costs=
2 X Bunk Beds
Room 9 -
Estimated costs=
1 X New blinds
Room 10
Material and labour costs for walls to form a hall way and sangha lounge extension.
Estimated cost=
Material and labour costs for new doorway into Choeying’s Estimated cost=
Material and labour costs for vanity and basic. Estimated cost=
Material and labour costs for floor sanding and estapol. Estimated cost=
Room 11 playroom
3 x single bunks=
Shared Bathroom for Room 10 & 11
Labour and material costs for a new shower
Estimated costs=
Labour and material costs for new vanity =
Material and labour costs for painting =
Room 12 -
Labour and materials for electrical work including globes=
Labour and material costs for tiles above vanity=
Room 13 -
Room 14 -
Estimated costs=
Material and costs for floor renovation
Estimated costs=
Material and Labour for Installation of electric fan=
Room 15 Library
Shift couches around
Room 16 Downstairs
Material and labour costs for gyprock ceiling repair=
Estimated costs =
Privacy curtain
Material and labour costs for 1 x new light =
Outdoors
Material and labour costs for new fence around whole property
Estimated costs=
Chicken house
Estimated costs=
Water Feature with huge Buddha. Estimated costs = $10,000
Estimated costs=
Bulk Pebbles costs=
Material and labour costs of Large rainwater tank=
Costs of large compost bin=
Costs of Worm farm=
Material and labour costs of replacing electricity with solar power for all the sanctuaries power.
Estimated costs=
2 X new shoe racks=
Material and labour costs for stupa. Estimated costs $100,000
Material and labour costs for large prayer wheel. $50,000
Labour costs for pulling down side brick wall=
Plant costs=
Costs for front light signage=
Bridget artwork for large front shared sign= $200
Sheets pillows, dooners, pillow covers etc for 16 rooms. Estimated cost=
We need 20 double bunk beds in total. We need 10 before our retreat on the 9 th and the rest before our visiting teacher comes in April 2012.
Once again thank you from the members of the Oddiyana Dharma Sanctuary
May you be happy
May you be well

If you prefer: simply deposit your much needed donation directly into our bank account:
Bank or E-